SIZE: 161 MW
LOCATION: Oldham County, Texas
OPERATING SINCE: Scheduled for completion 2014
UTILITY: Undisclosed
TURBINE EQUIPMENT: 87 – GE 1.85 MW
TRANSMISSION: 345 kV Substation, Joint Use Switching Station
INTERCONNECT: Sharyland AJ Swope Station
LAND: 26 landowners; 13,953 acres
CONTRACTOR: Mortenson Construction
DEVELOPER: Cielo Wind Power
OWNER: EDF-RE US Development LLC
HIGHLIGHTS:
- Energy for approximately 56,000 households per year
- Energy delivered to ERCOT through shared transmission facilities