Spinning Spur Wind Ranch®

SIZE: 161 MW

LOCATION: Oldham County, Texas

OPERATING SINCE: 2012

UTILITY: Xcel Energy

TURBINE EQUIPMENT: 70 – Siemens 2.3 MW

TRANSMISSION: 345 kV Substation, Joint Use Switching Station

INTERCONNECT: Potter County Interchange

LAND: 35 landowners; 28,425 acres

CONTRACTOR: Wanzek Construction, Inc.

DEVELOPER: Cielo Wind Power

OWNER: EDF-RE US Development LLC

HIGHLIGHTS:

 

  • Energy for approximately 56,000 households per year
  • Energy delivered to SPP through shared transmission facilities