Flexenclosure, a global leader in intelligent power management systems for the ICT industry, today unveiled its revolutionary new hybrid power system for telecom sites.
The eSite x10. eSite x10 will provide towercos and mobile operators a sustained advantage in terms of the highest possible uptime and the lowest possible site power costs. eSite x10 is the world’s first hybrid power system purpose-built for outdoor telecom sites and to outdoor telecom standards. It is a patented, sealed tamper-proof unit with passive convection cooling, no filters, no moving parts and it requires no maintenance.
Flexenclosure is an industry leader in the hybrid power system market, having deployed several thousand eSite systems in Africa and Asia. Three years in development, eSite x10 has been purpose-built from the ground up to withstand the operational challenges that have been the downfall of nigh on all of the hybrid power implementations around the world to date.
“eSite x10 is like no other hybrid power system available today and its launch is a ground-breaking moment in the industry’s history,” said David King, CEO, Flexenclosure. “Until now, hybrid power systems for off-grid or bad-grid telecom sites have been built using indoor components and deployed in outdoor locations where they are exposed to the most challenging environmental extremes imaginable.”
“These systems weren’t fit for purpose and they were highly unreliable. eSite x10 has been developed to overcome these operational issues and is, quite simply, the future of hybrid power.”
Key innovations
Some of eSite x10’s key innovations include:
- IP65 sealed and ruggedized to withstand the harshest operating environments as well as potential tampering.
- Tested and certified to the strictest CE and ETSI requirements.
- Patented protective soft power switching between grid and gensets.
- Single unit preconfigured to handle all site types greatly simplifies deployment planning and compact form factor allows unit to be hand carried to site.
- Preconfigured for up to three tenants with separate load measurement.
- Fully integrated eSite Tools suite provides reliable network data for highest sustained performance.
- Delivers 24/7 uptime and industry leading OPEX reduction.
Maintenance free
Neglected maintenance is a common source of hybrid power system performance issues today so eSite x10 has been designed to be maintenance-free with no filters or moving parts. It has no single point of failure and uses patented protective soft power switching between the grid and connected gensets to replace mechanical switching and thus protect the unit from potentially damaging input power while maximising energy harvesting.
eSite x10 also uses passive convection cooling, meaning no energy is wasted on active cooling systems such as air conditioning.
Simplified logistics
The size of the unit has been reduced by 75 per cent when compared with existing hybrid power systems and it can be hand carried to site, greatly simplifying transport logistics and deployment.
eSite x10 is preconfigured to handle all site types and includes built-in support for 6kWp solar power. All required systems are already in the unit making installation a simple and quick plug-and-play process. Power sources, batteries, and tenants are easily added in the connection compartment as and when required. And system configuration is managed remotely, removing any possibility of mistakes being made by on-site installers.
For additional information please contact:
David King
CEO, Flexenclosure
Phone: +46 (510) 427 000
Email: david.king@flexenclosure.com
About Flexenclosure:
Flexenclosure provides sustainable Internet infrastructure for emerging markets – designing and manufacturing prefabricated data centre buildings and intelligent power management systems for the ICT industry. The company provides systems that are fully integrated, modular, factory tested for reliability, adaptable to local conditions and quick to install.
eSite x10 is the world’s first hybrid power system purpose-built for outdoor telecom sites and to outdoor telecom standards. It is a patented, sealed, tamper-proof unit with passive convection cooling, no filters, no moving parts and it requires no maintenance. eSite x10 is the future of hybrid power.
eCentre is a state-of-the art, custom-designed, prefabricated and pre-integrated data centre building that is fast to deploy, energy efficient and fully future proofed. eCentre technical facilities provide flexible and easily expandable white space and have been certified up to Tier IV level.Flexenclosure was founded in 1989. The company is based in Vara, Sweden, headquartered in Stockholm and has additional offices in Malaysia, Mexico, Myanmar, Nigeria and South Africa. Customers include ACS, Airtel, Apollo Towers, IHS Towers, Millicom, MTN, Vodacom and Zain.See www.flexenclosure.com.