Close
 World Hydrogen & Carbon Americas
ACHEMA MIDDLE EAST

L-3 MAPPS to upgrade Pilgrim nuclear plant simulator

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Samsung C&T, Polish Developer Partner to Expand SMR Projects

The construction division of Samsung C&T is speeding up...

UMaine Adopts Large-Scale 3D Printing for Nuclear Reactor

The University of Maine has gone on to prove...

Construction of First Nuclear Power Plant of Poland to Start

The construction of the first nuclear power plant of...
- Advertisement -
Canada-based L-3 Communications MAPPS (L-3 MAPPS) has secured a contract from Entergy Nuclear to upgrade the existing Pilgrim nuclear power station (PNPS) full scope simulator and to equip the plant with an additional classroom simulator.

The PNPS simulator currently runs on SGI computers with the IRIX operating system, and once upgraded, its servers and instructor station will operate on PCs running the Windows operating system and L-3 MAPPS’ Orchid simulation environment.In addition to maintaining communications with the simulator’s existing input/output (I/O) system, a latest-technology expansion I/O system will be added by L-3 MAPPS, which will operate concurrently with the existing I/O system using Orchid Input Output.

The upgraded simulator is scheduled to commence operation in the summer of 2012.The power station is currently equipped with multiple classroom simulators which will be migrated to the new environment.An additional classroom simulator will be provided based on L-3’s Orchid Touch Interface technology.The three-bay classroom simulator uses large touch screen monitors with 1080p full HD resolution to display near life-size operable virtual control room panels, the company said.Under the contract, Entergy Nuclear has also an option to upgrade the PNPS simulator’s reactor core model with Orchid Core Builder.Located in the US state of Massachusetts, the Pilgrim nuclear power station has a generating capacity of 684MW.

 

Latest stories

Related stories

Samsung C&T, Polish Developer Partner to Expand SMR Projects

The construction division of Samsung C&T is speeding up...

UMaine Adopts Large-Scale 3D Printing for Nuclear Reactor

The University of Maine has gone on to prove...

Construction of First Nuclear Power Plant of Poland to Start

The construction of the first nuclear power plant of...

U.S. DoE to Offer Around $800mn for Small Modular Reactors

The U.S. Department of Energy has confirmed that it...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »