Close
MCE 2026
World Hydrogen & Carbon Americas

Nabrawind to bring self-erecting towers to Namibian wind project

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Origis Gets $545mn For Texas Solar and Energy Storage Assets

Origis Energy, which is Miami-headquartered, has gone ahead and announced that it...

Qnity Electronics Acquires $61.5mn Advanced Facility

Qnity Electronics, Inc. has announced the acquisition of a new...

GE Vernova to Supply 17 Turbines for Italy Fortore Wind Farm

GE Vernova has been awarded a contract to provide...
- Advertisement -

Spanish wind technology company Nabrawind SL will design and supply four self-erecting turbine towers for a wind project in Namibia. The project has been developed by Franco-Namibian company InnoSun Energy, part of French independent renewables company Innovent.

Nabrawind’s solution consists of a rock anchored tower with the Nabralift transition piece as the foundation. The Nabralift tower employs a self-erecting system that lifts the standard tubular tower section with the nacelle and the rotor by adding frame modules below them. The frame modules are connected to the transition piece, which will have three points directly anchored to the rock subsoil to distribute the load. With this structure, the concrete requirements of the project are reduced by 95%, saving around 1,000 tonnes of CO2 emissions, according to Nabrawind.

The tower design is a cost-competitive alternative for wind projects built in places where securing enough concrete may be a challenge, the Spanish firm added.

Construction is due to start in the second half of 2020. The Namibian project will be the second collaboration between Innovent and Nabrawind. The French firm last year ordered a Nabralift tower for a wind project in Morocco.

Latest stories

Related stories

Origis Gets $545mn For Texas Solar and Energy Storage Assets

Origis Energy, which is Miami-headquartered, has gone ahead and announced that it...

Qnity Electronics Acquires $61.5mn Advanced Facility

Qnity Electronics, Inc. has announced the acquisition of a new...

GE Vernova to Supply 17 Turbines for Italy Fortore Wind Farm

GE Vernova has been awarded a contract to provide...

EU Industrial Accelerator Act Targets Solar, Battery Supply

The European Commission has unveiled a draft Industrial Accelerator...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »