Close
MCE 2026
World Hydrogen & Carbon Americas

Nabrawind to bring self-erecting towers to Namibian wind project

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

China Solar Capacity Overtakes Coal in Power Transition

China is on course to reach a turning point...

HYTING Commissions World-First Hydrogen Air-Heating System

Hydrogen heating technology company HYTING has successfully commissioned its...

Nuclear Energy in Serbia Enters French-Backed Discussions

Serbia’s Minister of Mining and Energy, Dubravka Đedović Handanovic,...
- Advertisement -

Spanish wind technology company Nabrawind SL will design and supply four self-erecting turbine towers for a wind project in Namibia. The project has been developed by Franco-Namibian company InnoSun Energy, part of French independent renewables company Innovent.

Nabrawind’s solution consists of a rock anchored tower with the Nabralift transition piece as the foundation. The Nabralift tower employs a self-erecting system that lifts the standard tubular tower section with the nacelle and the rotor by adding frame modules below them. The frame modules are connected to the transition piece, which will have three points directly anchored to the rock subsoil to distribute the load. With this structure, the concrete requirements of the project are reduced by 95%, saving around 1,000 tonnes of CO2 emissions, according to Nabrawind.

The tower design is a cost-competitive alternative for wind projects built in places where securing enough concrete may be a challenge, the Spanish firm added.

Construction is due to start in the second half of 2020. The Namibian project will be the second collaboration between Innovent and Nabrawind. The French firm last year ordered a Nabralift tower for a wind project in Morocco.

Latest stories

Related stories

China Solar Capacity Overtakes Coal in Power Transition

China is on course to reach a turning point...

HYTING Commissions World-First Hydrogen Air-Heating System

Hydrogen heating technology company HYTING has successfully commissioned its...

Nuclear Energy in Serbia Enters French-Backed Discussions

Serbia’s Minister of Mining and Energy, Dubravka Đedović Handanovic,...

Amentum Secures UK Nuclear Power Plants Contracts with EDF

Amentum, a US defence and engineering firm, announced on...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »